Select Page

FLEETWELL – PART 14

FLEETWELL – PART 14

I’ve now added the concrete hardstanding to most of the docks area, using the download sheet TX134-00 which I glued to greyboard to achieve the level of the track work. After measuring the required distance between the crane’s running rails I fitted them in place and added the hardstanding to complete the area. where the container ship is moored.

I then placed the gantry crane onto the rails and moved the boom over the container ship and lowered the attached container onto the ship’s deck.

 

I now need to complete the dockside hardstanding and the container storage area.

To be continued…

Print Friendly, PDF & Email

About The Author

MalcT

Recently retired and building my first model railway in about 50 years. Live on the Lancashire coast with my partner Deb and our three French Bulldogs. Modelling OO gauge / recent/modern image / DCC NCE Powercab / Cobalt Alpha Power / Alpha Box / Alpha Central / Alpha Mimic / PSX-1 Circuit Breaker

Leave a reply

Become A VIP Today!

Translate